Basic Info.
Product Description
1. Main parameters of hot dip galvanizing machine
No | Item | Specification |
1 | material | steel wire |
2 | diameter range | 1/2~10 inch |
3 | pipe length range | 4~8 m |
4 | coating type | zinc |
5 | coating weight | 50~400g/m2 |
6 | capacity | 40000~80000T/year |
2. Technological process of production
Feeding → Alkaline washing → Water rinsing → Pickling → Water rinsing → Plating assistance → Drying → Hot dip galvanizing → External blowing → Internal blowing → Air cooling → Water cooling → Passivation → Water rinsing → Inspection → Marking → Packing and storage
3. Main process introduction
Alkaline washing: remove the oil from the surface of pipes.
Pickling: remove all oxides on the surface of the pipes.
Water rinsing: it is a very important step in hot dip galvanizing, prevent iron ions from the surface of the pipes into the zinc pot, too much iron ions will cause zinc ash, zinc slag too much production.
Plating assistance: activate the surface of steel parts, improve the quality of galvanized, it directly affects the quality of coating .
Drying: dry the surface of the pipes and improve the temperature of the pipes itself, to prevent zinc splashing.
Hot dip galvanizing: the molten zinc reacts with the iron matrix to produce an alloy layer, so that the matrix and the coating are combined.
External blowing:the excess zinc liquid is blown off the external surface of the pipes to obtain a smooth external surface.
Internal blowing:the excess zinc liquid is blown off the internal surface of the pipes to obtain a smooth internal surface.
Water cooling: quickly reduce the temperature of pipes.
Passivation:increase corrosion resistance of zinc layer to prevent white rust during transportation.
4. Product appliction
Construction, machinery, coal mine, chemical industry, electric power, railway vehicles, automobile industry, highway, bridge, container, sports facilities, agricultural machinery, petroleum machinery, exploration machinery and other manufacturing industries.
5. Packaging & Shipping
We can pack it by pallet, or according to the customers' specific requirements.
Port: Shanghai/Ningbo
6. Our Services
In order to guarantee the customers are able fully to operate the machine, if the customer need, we can help customer training, includes:
(1) Correct operating mode
(2) Correct maintenance way
(3) Correct technological process control
(4) Remove simple problem
Any doubt please contact us.